GOTIANUN-LED FILINVEST Land, Inc. has turned over a 6,000-square-meter (sq.m.) property in Bicutan to the Department of Transportation (DoTr) to facilitate theGOTIANUN-LED FILINVEST Land, Inc. has turned over a 6,000-square-meter (sq.m.) property in Bicutan to the Department of Transportation (DoTr) to facilitate the

Filinvest turns over land to link Bicutan property to future rail hub

2026/07/08 00:03
2분 읽기
이 콘텐츠에 대한 의견이나 우려 사항이 있으시면 [email protected]으로 연락주시기 바랍니다

GOTIANUN-LED FILINVEST Land, Inc. has turned over a 6,000-square-meter (sq.m.) property in Bicutan to the Department of Transportation (DoTr) to facilitate the development of the Bicutan Station, while advancing plans to connect its adjacent 6.5-hectare (ha) property to the future rail hub.

The property developer said the Bicutan Station will serve as an interchange between the North-South Commuter Railway (NSCR) and the Metro Manila Subway.

Filinvest also plans to develop the Filinvest Pedestrian Link, which will include an elevated pedestrian bridge across East Service Road and a covered walkway connecting the station to its 6.5-ha property and future developments.

“Our partnership with the DoTr for the Bicutan Station, which will be adjacent to one of our prime properties, is a testament to Filinvest Land’s commitment to building the Filipino dream by providing efficient and convenient transportation connections to potential urban growth centers and nearby residential areas,” Filinvest Land President and Chief Executive Officer Tristaneil D. Las Marias said in a statement on Tuesday.

The company said the Bicutan Station will feature a unidirectional track-sharing design that will allow Metro Manila Subway trains to run on NSCR tracks, creating a continuous rail link from Clark, Pampanga, to Calamba, Laguna.

“By dedicating this land and developing the Filinvest Pedestrian Link, we are helping build a more connected nation where citizens can travel safely, efficiently, and with dignity,” Mr. Las Marias said.

According to the company, the integrated station is expected to serve about 1 million passengers daily.

Filinvest said the broader project is projected to generate 350,000 direct and indirect jobs during construction and systemwide operations, which are targeted by 2033.

The 5.8-kilometer elevated railway segment covering the Bicutan and Sucat stations is scheduled for completion in 2031. — Juliana Chloe A. Gonzales

시장 기회
Railgun 로고
Railgun 가격(RAIL)
$1.6534
$1.6534$1.6534
-2.85%
USD
Railgun (RAIL) 실시간 가격 차트

World Cup Combo: Aim for 200x

World Cup Combo: Aim for 200xWorld Cup Combo: Aim for 200x

Combine up to 20 World Cup matches in one order

면책 조항: 본 사이트에 재게시된 글들은 공개 플랫폼에서 가져온 것으로 정보 제공 목적으로만 제공됩니다. 이는 반드시 MEXC의 견해를 반영하는 것은 아닙니다. 모든 권리는 원저자에게 있습니다. 제3자의 권리를 침해하는 콘텐츠가 있다고 판단될 경우, [email protected]으로 연락하여 삭제 요청을 해주시기 바랍니다. MEXC는 콘텐츠의 정확성, 완전성 또는 시의적절성에 대해 어떠한 보증도 하지 않으며, 제공된 정보에 기반하여 취해진 어떠한 조치에 대해서도 책임을 지지 않습니다. 본 콘텐츠는 금융, 법률 또는 기타 전문적인 조언을 구성하지 않으며, MEXC의 추천이나 보증으로 간주되어서는 안 됩니다.

$5M in SPCX Positions for Free

$5M in SPCX Positions for Free$5M in SPCX Positions for Free

0 fees, 100x leverage, daily prizes, 7K+ stocks/ETFs